Personal tools

Skip to content. | Skip to navigation

Sections

"" />

 


Subscribe to our RSS feed
 Join the conversation on Linkedin Follow us on Twitter Watch mining videos on Youtube Like us on Facebook
 

Get your free AJM trial

 
You are here: Home Mining News News 2009 August August 27th 09 New Products Record Australian ROV tunnel penetration

Record Australian ROV tunnel penetration

by wallacep created Aug 24, 2009 02:29 PM

A partnership between, Gold Coast based ROV Downunder and Seaview Systems, Inc. from the US recently carried out what is believed to be the two longest Remotely Operated Vehicle (ROV) tunnel penetrations in Australia.

  
Record Australian ROV tunnel penetration

The modified Falcon DR ROV being lowered to inspect the desalination plant tunnels. Image courtesy ROV Downunder and Seaview Systems

The record breaking ROV penetrations were carried out to inspect the intake and outfall tunnels of the new Gold Coast Desalination Plant at Tugun in Queensland.
ROV Downunder’s Bill Bulloch project managed the inspections in conjunction with the Seaview Systems US team. Seaview Systems air freighted its modified Falcon DR, a custom umbilical winch and peripheral equipment to Australia to investigate the 2.2 kilometre intake tunnel and the 2 kilometre outlet tunnel.
The Falcon DR has been modified with a SeaView Systems in-house surface power supply, umbilical and tunnel modeling software.
Access to the tunnels was by 60-metre depth vertical access shafts, once in the tunnel the vehicle reaching penetration distances of approximately two kilometres. The ROV captured video and profiling sonar data which allowed SeaView to develop a three-dimensional model of the tunnel’s internal surfaces. Both the video and 3D model will be used as a baseline for future inspections.
The plant was constructed by the Gold Coast Desalination Alliance (GCDA) for WaterSecure, the Queensland Government authority responsible for the supply of desalinated water to the South East Queensland Water Grid.
GCDA comprises John Holland, Veolia Water, Sinclair Knight Merz and Cardno. While John Holland was principal contractor for the construction, Veolia Water Australia will take primary responsibility for the operation of the plant. Initially, the investigations were performed from onshore, with GCDA requesting an additional investigation of the offshore structures.

The 9th Tunnelling Conference - 28-29 October 2009 | Sofitel Brisbane
Promoting world best practice in design, construction and maintenance for Australia’s tunneling industry
For more information visit:
www.informa.com.au/conferences/infrastructure/the-9th-tunnelling-conference





Document Actions

Strapline1

Current Print Edition

AJM-J-F-12